Feels like Raytheon all over again
Tomorrow is our continuous assessment 2 deadline (major milestone evaluation) for our EE2001 design project.
They need us to pull together a good amount of documentation about our designs so far. And with the requirement of having revision information, this is feeling strangely familiar to me putting together an ECO package.
Preparing all these documents, getting the latest numeric revisions up to scratch, and then gathering all the different document types together to make sure I don't miss anything. It's almost like I'm gathering all these together for a major release or something.
Plus the documents themselves are reminiscent of what I'd be used to seeing... parts lists, specification documents, schematics, block diagrams, etc. All I'm missing are some mechanical drawings and perhaps some test procedures with their respective reports.
That and a one page sheet listing all the documents affected and who needs to approve them ![]()


